- Connect the 2 wires to the appropriate 110 VAC or 12 VDC power source and let the unit source and let the
- Secure sample inlet and outlet connections using insulated fitting for sample inlet
- Connect purge inlet and outlet fittings
- Start purge flow(purge air must be -40°C dew point air, nitrogen or other gas)
- Start sample flow. Sample must be maintained at constant temperature from its origin to prevent condensation