Place ZAG on level, dry surface.
2. Check to make sure power switch is in “OFF” position.
3. Plug unit into standard 115VAC electrical outlet.
4. Turn flow control knob counter-clockwise to open fully.
5. Connect calibration gas line to ¼” tube compression fitting located on top panel of generator.
6. Turn power switch to “ON” position.
7. Adjust flow control valve to desired air output. Maximum capacity is 18 lpm.
8. High purity air will be produced within 23 minutes after start-up.