In the Siphon feed setup shown above, the target temperature at which the air will be fully saturated (“dew point”) must be determined in order that it is heated or insulated to this temperature and kept constant. A reservoir of de-ionized water is pulled through to fill the shell side and cap off at the outlet. A positive pressure sample gas is pushed through the inner tubes and is humidified.